Metal Wire Sawing
High Level Duct Removal
To enable the replacement of a large section of ducting an existing duct needed to be separated at two locations to allow its removal. The work was carried out at a significant height from a scaffold platform.
Read more
SDP Plant Removal
BD Nuclear was commissioned to remove stainless steel pipework and vessels from the SDP Pant at Sellafield.
Steel Sludge Tank Size Reduction
BD Nuclear were tasked to cut up a heavily contaminated sludge tank. The tank measured 7m long, weighed 13 tonnes and was lined with a rubber coating.
Bespoke Cutting Systems
FEDER Demolitions
Commissioned to demolish concrete structures above the Fuel Element Debris (FED) Cells at Trawsfynydd.
Concrete Wire Sawing
Dragon Bio Shield Removal
To allow its segmentation and removal a combination of Wire and Track Sawing was utilised. BD Nuclear bespoke lifting bars were also used to ease the handling of the block sections following cutting.
SGHWR Secondary Containment
BD Nuclear were commissioned to support our client with cutting services and the supply of labour. The cutting operations saw the introduction of diamond wire sawing of metal.
Pond Skip Size Reduction
BD Nuclear were approached by BNG to provide a solution for size reduction of 200 heavily contaminated skips.
Dragon Decommissioning
BD Nuclear were contracted to provide nuclear decommissioning operatives, charge hands and supervisors to support decommissioning activities at Winfrith.
Concrete Sludge Tank Size Reduction
Commissioned to undertake the size reduction of the concrete tanks that once stored sludge generated from the operation of the SGHWR at Winfrith.
Sodium Plant Removal
Following on from the successful conclusion to the work undertaken at SGHWR an opportunity of a similar scale was realised at Dounreay. BD Nuclear secured the contract to size reduce 100’s tonnes of sodium plant at the PFR.
Bradwell Pond Skip Size Reduction
BD Nuclear were asked to come up with a solution to size reduce Pond Skips at Bradwell for Magnox.
Harwell Pond Furniture Size Reduction
BD Nuclear were commissioned to size reduce contaminated pond furniture at Building B466 at Harwell for RSRL.
Diamond Drilling
Supernatent Tank Roof Removal
BD Nuclear were commissioned to remove the roof from three concrete sludge tanks under C3 Conditions. The work required the roofs to be removed in small sections due to lifting constraints.
Track Sawing
Contaminated Tube Removal
The client needed to remove contaminated steel tubes from a concrete surround. The contaminants were relatively low level and the tubes filled with foam to stabilise.
Bespoke Cutting Services
Underwater Cutting Trials
BD Nuclear have successfully undertaken the first stage of trials for underwater electric tracksawing using the latest cutting technology for size reduction in a highly contaminated area.
Plunge Cutting Trials
BD Nuclear undertook the development and successful trialling of a specialist semi-remote plunge-cutting rig which has been accepted by ACTUS for use on the Magnox estate.
Evaporator Sectioning - LSE
BD Nuclear received an enquiry from a contractor working at the London Stock Exchange to assist with the removal of large evaporator machinery so that the aging equipment could be replaced.
Drilling of Heel Pool Trial Penetration
BD Nuclear won the contract to provide a solution to drill into the underneath of a heel pool. This heel pool was used to store sodium which was used as coolant during a nuclear process.
Harwell Steel Cutting Track saw
BD Nuclear achieved a U.K first by deploying a steel cutting track saw in a nuclear environment.
Removal of contaminated Floor
BD Nuclear won a contract to size reduce and remove a heavily contaminated floor.
Plinth Size Reduction
Due to a design change BD Nuclear were asked to reduce the height of two concrete plinths 14 metres long and 2.2metres wide by 800mm. we had a 12mm tolerance over the length of the plinth.
Congress Theatre Eastbourne
The project involved the careful removal of existing masonry walls and structural slab in the basement of the grade II* building, this work had to be carried out without damage to the existing fixtures and fittings.
Shaving
East Tanks Shaving
BD Nuclear were tasked to remove a heavily contaminated surface. The area had been a sludge storage facility.
Stitch Drilling
Text
Concrete Wall Track Sawing
BD Nuclear used a track saw to cut and form openings in concrete wall, due to a design change.
Concrete Floor Stitch Drilling
BD Nuclear where asked to come up with a solution to an issue a client was having to remove concrete in a basement with restricted head room.
Basement Window
BD Nuclear were contracted to create 2 window holes in a basement to allow more light in, a time critical job completed within the time frame
HMP Kingston Prison
See our latest project renovating an old victorian grade II listed building
Stealth III
BD Nuclear have once again raised the bar in brand new design and technology with our bespoke design and innovation with our brand new ‘STEALTH III’ Hot cell wire saw’