PROJECT: Harwell Pond Furniture Size Reduction

Client: KDC

Location: Harwell, Oxon

Project Length: 10 days

Project Overview

BD Nuclear were commissioned to size reduce contaminated pond furniture at Building B466 at Harwell for RSRL.  This required us to set up a ventilated containment and undertake lifting operations to move the equipment into the containment.  The works required the size reduction of a lead lined shielded cone, a flask stand and a cutting table.  The work was successfully completed using a diamond wire saw.