PROJECT: Bradwell Pond Skip Size Reduction

Client: Magnox

Location: Bradwell, Essex

Project Length: 2 weeks

Project Overview

BD Nuclear were asked to come up with a solution to size reduce Pond Skips at Bradwell for Magnox.  Due to extremely high dose levels the application had to be semi remote.  BD Nuclear designed and built a bespoke cutting jig to complement the cutting equipment already installed by ourselves on a previous contract.  This allowed us to section the pond skips for flat packing.